Xeres / Magic Items / Duraz-Khul / Upgrades / Redundant Mana Conduits

Redundant Mana Conduits

A second set of veins, so the first never has to work alone
Power Core & Mana Systems Prerequisite: none
Redundant Mana Conduits
⚡

Description

Every enchanted system aboard Duraz-Khul draws its power through a single main conduit line running from the Sky-Heart Core - efficient, but a single point of failure, and a serious bottleneck when multiple systems try to recharge at once.

This upgrade lays a second, fully independent set of conduit lines alongside the first, threading through the fortress's stone in parallel channels that runesmiths sealed off from one another to prevent one damaged line from taking down the whole network.

With two lines instead of one, recharging systems no longer have to wait their turn in a single queue; the load splits, and everything downstream benefits.

It's unglamorous work - mostly buried conduit-laying through service tunnels most residents never see - but the engineers who installed it consider it some of the most consequential plumbing in the fortress's history.

The most visible benefit shows up on the battlements: the Thundercoil Cannon, formerly hobbled by an 8-hour recharge between shots, now comes back online in half that time.

✦

Benefits

Backup conduit lines halve the recharge time of other active systems (for example, the Thundercoil Cannon's 8-hour recharge drops to 4). Generates 5 Prestige, and draws 3 power from the Sky-Heart Core's reserve while active.

Prestige
+5
Power
-3
Cost
225,000